Monday, June 6, 2016

Unsafe Costly National Highways, Expressways

Unsafe Costly National Highways, Expressways- $5m-$16m/km
June06, 2016 (C) Ravinder Singh progressindia2015@gmail.com
Yesterdays accident was avoidable tragedy. India has been MINDLESSLY
Converting existing Two Lane Highways to Four Lanes and Four Lanes to
Six Lanes –
California vs India – National Highway Standards
http://www.dot.ca.gov/hq/oppd/hdm/pdf/english/HDM_Complete_07Mar2014.pdf
307.2 Two-lane Cross Sections for New Construction – These standards
are to be used for highways on new alignment as well as on existing
highways where the width, alignment, grade, or other geometric
features are being upgraded. A 2-lane, 2-way roadbed consists of a
24-foot wide traveled way plus paved shoulders. In order to provide
structural support, the minimum paved width of each shoulder should be
2 feet.
305.5 Paved Medians (1) Freeways. (a) 6 or More Lanes–Medians 30 feet
wide or less should be paved. (b) 4 Lanes–Medians 22 feet or less in
width should be paved, between 22 feet and 30 feet wide be paved only
if a barrier is installed.
Corrupted, Compromised & Costly Four & Six Laning
California Freeway Users 95% Cars, India 30%-70% Trucks/CV
California adopts 24 feet wide Travelled way for Two Lanes in one
direction, Plus 2 Feet Shoulders on both sides and 22 ft paved Median
[24 + 4 +11 = 39 ft]. NH 4 Four Lanes have 21 feet Travelled Way – 1.5
feet pavement along median and 3 feet in outer side = 25.5 feet. THERE
IS 50% PAVED ROAD IN USA FOR TWO LANE x TWO LANE HIGHWAYS.
https://en.wikipedia.org/wiki/List_of_countries_by_traffic-related_death_rate
Accident Rate India 130 Per 100,000 MV – USA 13, UK 5, EU 5-10, Japan
6.5.  This is 10x to 20x of Developed Counties Avg.
Narmada Mainline Per Km Cost – $3m – 2 New Lanes NH – $5m
–    Cost of This ‘Two New Lanes’ is Exorbitant – Rs.19 Cr Per Km
completion but in collecting tolls more than double this cost to $5m
per km.  [Rs.4800 Cr for 256 km Bhavnagar-Somnath Four Laning]
–    This is roughly Rs.2 lakh per meter 21 ft road & Rs.4 Lakh per meter.
–    Narmada Mainline Average Width is 200ft and 15-20 ft deep with
Concrete Lining Cost just Rs.14 per km.
http://nca.gov.in/forms_pdf/annual-report-2014-15/annual-report-2014-15.pdf
2.2.2 NARMADAMAIN CANAL(GUJARAT)
The Narmada Main Canal (NMC) offtakes from Sardar Sarovar Dam in
Gujarat and after traversing a distance of 458.318 Km enters Rajasthan
near village Silu in Sanchore tehsil of Jalore district. — A
cumulative expenditure of Rs.6469.05 crore has been incurred on Main
Canal works upto 31st March, 2015,
National Highways 1.7% Length, 40% Accidents & 60% Deaths.
Ravinder Singh, Inventor & Consultant, INNOVATIVE TECHNOLOGIES AND PROJECTS
Y-77, Hauz Khas, New Delhi-110016, India. Ph; 091- 9871056471,
9718280435, 9650421857
Ravinder Singh* is a WIPO awarded inventor specializing in Power,
Transportation,
Smart Cities, Water, Energy Saving, Agriculture, Manufacturing,
Technologies and Projects

No comments:

NASA : Search for Alien Life on Saturn’s Moon On Thursday NASA announced a mission to land a car-sized robot quadcopter on S...